TCC established TCC Green Energy in 2018. It is the only renewable energy company in Taiwan engaged across solar, wind, geothermal and marine energy. Starting from grid connection of the Changbin wind and solar site, TCC went on to develop hybrid renewable energy sites, and further expanded into forward-looking energy research including geothermal development at Hongye Valley in Taitung and aquavoltaics in Chiayi.
Installed Capacity by Technology
21 sites in operation or under construction, 2021-2025
Solar
141.8 MW
Wind
36 MW
OTEC
2 MW
Geothermal
1 MW
Sites are additionally equipped with 9.9 MW of energy storage.
Flagship Sites

Changbin Wind and Solar Hybrid Power Plant
The solar area applies a Nature-based Solution (NbS) through a sheep-solar symbiosis model.

Yizhu Aquavoltaics, Chiayi
Taiwan's first aquavoltaics site, combining local revitalisation with sustainable tourism. 80% of aquaculture operators have obtained traceability certification.

Hongye Valley Geothermal Power, Taitung
All units are expected to complete grid connection in 2026.
The World's First MW-Scale Ocean Thermal Energy Conversion Plant
Marine energy is stable and can operate 24 hours a day, making it a more reliable baseload option. The key to developing it is ready access to deep sea water. Off the east coast of Taiwan, a depth of 600 metres is reached just 1.6 kilometres offshore, and this trench topography meets the conditions for deep sea water intake. TCC's Ho-Ping integrated port, power and cement complex is located in Hualien. Beyond its geographic advantage, the Ho-Ping Power Plant can combine existing resources with ocean thermal energy conversion (OTEC): because the cooling water required for plant operation never comes into contact with the production process, it can be reused for heat exchange with deep sea water to drive turbines. As the cooling water is 5-6°C warmer than surface seawater, generation efficiency is higher.
Once built, it will be Taiwan's first and the world's first MW-scale OTEC plant in commercial operation. First-phase installed capacity is expected to be 1-2 MW, supplying approximately 24,000 kWh per day, equivalent to the electricity used by around 2,000 households. The target is grid connection and commercial operation by the end of 2029.
2024
Underwater cultural heritage review completed
2025
Entered environmental impact assessment review by the Ministry of Environment
2029
Target for grid connection and commercial operation by year end
First-phase capacity
1-2 MW
Daily supply
24,000 kWh
Smart Operations and Maintenance
Operations and maintenance are digitalised and data-driven. 100% of sites transmit data remotely and automatically. AI analyses historical generation and meteorological data to identify anomalies in real time, and automated alerts help on-site personnel respond promptly, improving operational efficiency.